Physical | ||
---|---|---|
Height | 21.4 inches | 54.3 cm |
Width | 36.8 inches | 93.3 cm |
Depth | 38 inches | 96.5 cm |
Weight | 350 lbs | 158.8 kg |
Electrical Power | ||
MRU-TQ1-404 | 120 VAC, single-phase, 60Hz | |
MRU-TQ3-404 | 208 VAC, 3-phase, 50/60 Hz Y Connection w/Neutral | |
Cooling Capacity | ||
MRU-TQ1-404 | 2,800 BTU/hr (820 W) at 0°F/100°F | 6,600 Btu/hr (1,933 W) at 35°F/100°F |
MRU-TQ3-404 | 4,100 Btu/hr (1,200 W) at 0°F/100°F | 9,750 Btu/hr (2,857 W) at 35°F/100°F |
Refrigerant | R-404A | 6 lbs 8 oz |
Set Up Time – The MRU can be installed in less than 30 minutes by two personnel and is operable by a soldier outfitted in all levels of Mission Oriented Protective Posture (MOPP) equipment. The MRU requires less than 90 minutes Mean Time To Repair (MTTR) including evacuation and recharging using standard, commercial support and test equipment. |
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |